中文 |

Newsroom

pk10免 费 挂 机 软 件【cu6】:停课不停教停课不停学线上教学

2020-09-27 12:15:15

《pk10免 费 挂 机 软 件【cu6】》"My gracious!" said Si, as soon as he was wide enough awake to understand the Orderly-Sergeant's words, "is it possible that we're going to have plenty of hardtack and pork and coffee again? Seems to me a hundred years since we drew a full ration."

"Men, go to your quarters."

They turned their eyes to the crest, and there saw Pete waving his hat to them.

"I thought he had in him the makin' o' the finest horse in Posey County."

Capt. McGillicuddy stepped over to the right of the line stopped in front of Harry Joslyn and Gid Mackall. Shorty full-cocked his gun with two sharp clicks.

"You shall have it," laughed the Surgeon. "I know you. You are all right when you are all right. But you won't be able to march with the column to-day. I'll give you an excuse from duty. And you (to Si) had better stay with him. I'll speak to your Captain."

"I think each boy can eat about a cupful, so I'll put one for each of 'em in the kettle."

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences