中文 |

Newsroom

【O8J】吉林快3开奖今天开奖结果:新型冠状病毒肺炎疫情来源地

2020-09-22 04:32:35

《【O8J】吉林快3开奖今天开奖结果》Three youths, thrilled by the prospect of a mysterious adventure, and a war pilot, intent on a friendly service, discussed plans for protecting the Everdail Emeralds.

In the mouth of a broad channel they touched water and ran out of momentum with the wings hovering over the grassy bank to either side.

“We will, gladly, sir,” agreed Larry.

“Superstitions and all!” chuckled Dick.

No bird ever was more free.Instantly the situation became clear to the Sky Patrol.

The man claiming to be Mr. Everdail made a skillful getaway from the beach, and it took them very little time to get over the marsh, already free of fog.

There was no need for the concern that all four felt for the moment.

“The only trouble about this-here instruction is that I’m scared you’re going to make a better pilot than your teacher.”

“He’s swinging the boat out to open water again!” cried Sandy.

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences