中文 |

Newsroom

现在网上彩票是否可以:疫情期间防范工作措施开展

2020-09-27 12:16:19

《现在网上彩票是否可以》Nothing that I can tell you, he said. I didnt mean to speak of myself.It was all happening exactly as Keeling had{323} anticipated, and he laughed for joy, as he stepped inside.

Look here, Miss Propert, he said. Theres enough of this.

Mrs Keeling looked round in a distressed and flurried manner, with her feeble geniality showing like some pale moon behind clouds that were growing rapidly thicker.

Alice fixed her faint eyes on her father.He held out his hand.

Keeling failed to find any indication of singing in the wilderness here, nor had he got that particular sense of humour which could find provender for itself in these almost majestic structures of incoherence. At all times his wifes ideas ran softly into each other like the marks left by words on blotting paper; now they exhibited a somewhat greater energy and ran into each other with something of the vigour of vehicles moving in opposing directions.

That grim mouth, which she had always thought so forbidding and unsympathetic, suddenly wore to her a perfectly new aspect: it was strong and tender.

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences