中文 |

Newsroom

《分分彩会作弊吗 》_分 分 彩 投 注 止 损 方 法 精准杀号在线计划:云顶之亦机甲阵容

2020-09-23 07:20:23

《《分分彩会作弊吗 》_分 分 彩 投 注 止 损 方 法 精准杀号在线计划》Alice moved aside the table which carried her{336} tray. You never liked him, she said. How is it you can help me like this? How can you understand, if you didnt like him?

Yes, its just a matter of business, isnt it? he said.{188}

Yes, she said softly, raising her eyes again. And now shall we get on with the letters, Sir Thomas. There are still a good many not answered.

Propert laughed.

Then shall I go down to your house now, and get on with my business? she said.

And then the moment was over, except that in the secret place of his brain the voice sang in the{267} wilderness, and he looked at the letter she had given him. The words danced and swam; presently they steadied themselves.

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences