中文 |

Newsroom

北京福彩pk拾数据:老虎证券公司在哪个国家

2020-09-20 07:27:19

《北京福彩pk拾数据》

Trafford smiled.

“You confess, then?” he said.

She took up her life where she had left it the day Mr. Pinchook had taken her away. Her beautiful horse had been kept for her, as if everybody had expected her to come back, and it welcomed her as if he had been parted from her for only a few days. She strolled about the camp, sat on the edge of the claims, rode up the valley and over the hills with Varley or some of the boys, and took her share in the household duties in the hut, just as of old.

Varley Howard put on the tall silk hat which distinguished him, and sauntered out of the saloon. He paused outside to light a cigar and look up at the starlit sky, then he sauntered down to Mother Melinda’s hut.

[67]

“To London?”

“She is superb! She is magnificent!” she exclaimed in hushed staccato. “She will do your ladyship credit. Ah! what a sensation she will create! You leave it to me!”

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences