中文 |

Newsroom

江苏快3三军是哪一种玩法:王者荣耀就不去

2020-09-21 08:07:57

《江苏快3三军是哪一种玩法》Wonderful eyes she had; deep blue, as I have said, in color; black, in spirit; never so wonderful as when having sparkled black they quieted to blue again. Always then there came the slightest of contractions at the outer corners of the delicate lids, that gave a fourfold expression of thought, passion, tenderness and intrepidity. I never saw that silent meaning in but one other pair of eyes; wherever it turned it said--at the same time saying many other things but saying this always plainest--"I see both out and in; I know myself--and thee." Never but in one other pair of eyes? no; and whose were those? Ned Ferry's."With his, Smith, and most injuriously. He's here to tempt her to forget she's not--" He faltered.

"Has Ned Ferry come?" was his first call. I shook my head. "Oh, thank God!" he cried with a wild gesture and sank low in the saddle; but instantly he roused again: "Oh, don't stop me, Smith; if I once stop I'm afraid I'll never get to her!"

"All the same," said Harry, "I'm sorry for the little girl!"

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences