中文 |

Newsroom

中国福利彩票双色球购买网【稳赢技巧】:恋爱期间的转账要回

2020-09-27 09:29:55

《中国福利彩票双色球购买网【稳赢技巧】》They easily proved it. More, they located the wiring in the dusk.

Noting its white boundary lights, its red warnings, its windsock to give him the direction of the air currents, he circled the field several times, to be sure he would not foul any other ship, and to see if any signal would be sent him.

“Good! Here we go—to the right. Get your eye on that Fall River Liner, coming up the Sound—that’s about the point of our first leg.

Through a thin cleft in the heavy mist, not far below them the dark outlines of eel-grass, flanking two sides of a channel in the swampy shore line stood out, for an instant, clear and menacing.

At Sandy’s cry his chum, as well as the oldest Sky Patrol, turned.

“How will you know when the yacht is due?” Larry asked.

“She was in the second airplane.”

47

Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

"I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

World dignitaries celebrate a collaborative achievement

Related Articles
Contact Us
  • 86-1999-99883v685 (day)

    86-1999-99885z652 (night)

  • 86-1999-998853658 (day)

    86-1999-990253658 (night)

  • [email protected]

  • 52 Sanlihe Rd., Beijing,

    China (1008666x)

Copyright © 2002 - Chinese Academy of Sciences